D-PST-MN-A-24 PDF Pass Leader, D-PST-MN-A-24 Latest Real Test [Q29-Q48]

Rate this post

D-PST-MN-A-24 PDF Pass Leader, D-PST-MN-A-24 Latest Real Test

Valid D-PST-MN-A-24 Test Answers & D-PST-MN-A-24 Exam PDF

EMC D-PST-MN-A-24 Exam Syllabus Topics:

Topic Details
Topic 1
  • Troubleshooting: In this section of the exam, the focus is on troubleshooting techniques for PowerStore systems. It includes interpreting hardware fault LEDs, using PowerStore Manager alerts for diagnostics, and employing the PowerStore Command Line Interface (PSTCLI) for troubleshooting.
Topic 2
  • PowerStore Implementation: This segment delves into the implementation of PowerStore networks. It examines Ethernet switching, network requirements, and configuration options.
Topic 3
  • PowerStore Maintenance: This part addresses maintenance procedures for PowerStore systems. It covers handling protocols, customer-replaceable units (CRUs), and field-replaceable units (FRUs).
Topic 4
  • PowerStore Concepts and Features: This part of the exam covers PowerStore system and use cases, PowerStore system configuration and models and frameworks, and PowerStore architecture and hardware components.

 

NO.29 A Storage Administrator ran a PSTCLI command on a Linux host. The error ” -bash: pstcli: command not found” appears. How is the problem resolved?

 
 
 
 

NO.30 When looking at the base enclosure front view, what does a solid amber drive LED indicate?

 
 
 
 

NO.31 What is a step in configuring the ToR data switches for a Dell EMC PowerStore T?

 
 
 
 

NO.32 Which number in the code-naming schema represents a beta distribution?

 
 
 
 

NO.33 What describes Dell EMC PowerStore X front-end cabling?

 
 
 
 

NO.34 What is the protocol used for the storage network?

 
 
 
 

NO.35 Which component is an FRU?

 
 
 
 

NO.36 What safety equipment is critical to have on hand to avoid equipment failure before replacing any components in a Dell EMC PowerStore array?

 
 
 
 

NO.37 The “svc_rescue_state list” shows a node in service mode. How can the node be returned to normal mode?

 
 
 
 

NO.38 How can the PUHC health check results be viewed?

 
 
 
 

NO.39 A Storage Administrator notices a Critical alert present in Dell EMC PowerStore Manager relating to data integrity. What action within the alert details slide-out panel is helpful in troubleshooting the problem?

 
 
 
 

NO.40 Refer to the exhibit.

Refer to the exhibit.
What Dell EMC PowerStore ToR front-end cabling is shown?

 
 
 
 

NO.41 When a Dell EMC PowerStore node powers up in service mode, what are the commands and sequence used from the appliance SSH client to restore the node back to normal?

 
 
 
 

NO.42 What describes the SAS cabling when adding an expansion enclosure to a Dell EMC PowerStore, for each node and expansion enclosure side?

 
 
 
 

NO.43 Which type of device is supported in expansion enclosures?

 
 
 
 

NO.44 A Storage Administrator needs to connect through SSH to run svc commands. How is the SSH session configured?

 
 
 
 

NO.45 A Storage Administrator has an existing single appliance Dell EMC PowerStore 3000T cluster. An additional PowerStore 9000T has been purchased to add into the existing cluster.
How does the administrator proceed?

 
 
 
 

NO.46 What is the result of setting a VLAN ID of 0 on a network when running ICW for Dell EMC PowerStore?

 
 
 
 

NO.47 Which component can be replaced while the Dell EMC PowerStore is up and running?

 
 
 
 

NO.48 In which step of the ICW can the configuration details be exported?

 
 
 
 

D-PST-MN-A-24 Dumps Ensure Your Passing: https://www.real4dumps.com/D-PST-MN-A-24_examcollection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below