Laboratory tests of a new polymer prototype yielded the following proportions of a critical compound:
4.2 ppm, 4.1 ppm, 4.7 ppm, 4.9 ppm, 5.3 ppm
What is the sample standard deviation?
Response:

 
 
 
 

QUESTION 204
An engineer must design a product with a probability of success 99%. Assume that both the strength and stress are normally distributed and that the standard deviations are the same.
If the stress is known to be 3000 lbs with a standard deviation of 100 lbs, what must be the approximate designed strength?
Response:

 
 
 
 

QUESTION 205
A component has a constant failure rate of 0.0005 failures per hour. What is the reliability for 1,000 hours of operation assuming wearout is not a factor?
Response:

 
 
 
 

QUESTION 206
Human factors in product safety planning are assessed for which of the following reasons?
I. To allocate the proper balance between man and machine.
II. To address the limitations of human beings.
III. To determine the user hardware interaction.
Response:

 
 
 
 

QUESTION 207
Which of the following is an appropriate use for experimental design?
Response:

 
 
 
 

QUESTION 208
When failed field item are returned for failure investigation, which of the following steps should be taken first?
Response:

 
 
 
 

QUESTION 209
Which of the following provides the maximum benefit of parts standardization?
Response:

 
 
 
 

QUESTION 210
Regarding computer hardware and software reliability, which of the available answers would NOT enhance software reliability?
I. Structured programming.
II. Redundant code programming.
III. Modular programming.
IV. Programming for fault tolerance.
Response:

 
 
 
 

QUESTION 211
What is the probability of exactly 3 defects given the following?
– Probability of 1 or more defects = 0.75
– Probability of 2 or more defects = 0.41
– Probability of 3 or more defects = 0.17
– Probability of 4 or more defects = 0.05
Response:

 
 
 
 

QUESTION 212
A reliability test was terminated after 171 hours based upon a pre-established plan. An estimate of mean-time-to-failure of 57 hours was obtained. The lower 95 percent confidence bound on the true population mean-time-to-failure is:
Response:

 
 
 
 

QUESTION 213
Using complete field-based data, a reliability engineer has analyzed the reliability growth of a repairable system over the last 24 months. The analysis suggests a “no growth” condition, and that finding is reported to management.
Due to a pending multimillion dollar order, management requests that a line be drawn to show growth where none actually exists. The engineer’s department manager directs the engineer to comply with management request.
The system is released without improvements and the company receives the multimillion dollar order from an external customer. The customer then requests evidence of the reliability growth. Which of the following actions by the engineer would be MOST appropriat?
Response:

 
 
 
 

QUESTION 214
A person takes their car to the repair shop and it stops doing what it was previously doing. This is an example of:
Response:

 
 
 
 

QUESTION 215
Maintainability of equipment may be measured in terms of:
I. Maintenance dollar cost.
II. Maintenance man-hours.
III. Repair time
Response:

 
 
 
 

QUESTION 216
Which of the following FTA statements is NOT true?
Response:

 
 
 
 

QUESTION 217
Given the sample data: 5, 15, 10, 7, 20. What is the unbiased estimator of the sample variance?
Response:

 
 
 
 

QUESTION 218
Which of the following is a basic element in the corrective action process?
Response:

 
 
 
 

QUESTION 219
Which of the following should be avoided in parts selection to enhance the design reliability?
Response:

 
 
 
 

QUESTION 220
A first step in the FMECA is to:
Response:

 
 
 
 

QUESTION 221
Design plans are BEST developed for product reliability with significant input from which of the following?
Response:

 
 
 
 

QUESTION 222
Develop the fault tree analysis for a candy dispensing machine. There are two contributing subsystems, both of them must fail for the system to fail. The electronic release has Pf = 0.04 and the coil spring release has Pf = 0.06. What is the system’s probability of failure?

Response:

 
 
 
 

QUESTION 223
The reliability growth factor is MOST important to consider in which of the following situation?

Response:

 
 
 
 

QUESTION 224
If a company monitors field reliability using both 6 and 12 month MTBF moving average, a comparison of the average will generally show that the 12 month moving averages Response:

 
 
 
 

QUESTION 225
Internal testing sources of component reliability data are:
Response:

 
 
 
 

ASQ CRE Certification Exam covers a wide range of topics, including reliability management, reliability modeling, reliability testing, data analysis, and quality control. To be eligible to take the exam, candidates must have at least eight years of experience in the field of reliability engineering, with a minimum of three years of experience in a decision-making role. Candidates must also have a bachelor’s degree or higher in engineering, physical sciences, mathematics, or a related field. Passing the ASQ CRE Certification Exam demonstrates to employers and peers that an individual has the knowledge and skills to effectively manage reliability and improve quality, which can lead to greater career advancement opportunities and increased earning potential.

 

CRE Dumps PDF – CRE Real Exam Questions Answers: https://www.real4dumps.com/CRE_examcollection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below