Q42. Which of the following tests measures axial uplift whenperforming load testing of driven-pile foundation members

 
 
 
 

Q43. A 1. 100 ft, 2 ranch home with cathedralcallingshas a 14 ft. x 41 ft. 8 in , south-facing , composite shingle roof. An engineer has determined that the home’s 2 in, x 6 in. on-center roof rafters are strong enough to gold a solar electric system. The system will have 62.25 in. x 32.50 in. modules with a 1-in gap between modules and a standard twin-rillmounting system number of modules that can fit on the roof on under these conditions?

 
 
 
 

Q44. Which of the following is the required MINIMUM width of the working space In front of ac disconnect equipment?

 
 
 
 

Q45. In the middle of a winter day, the data acquisition system for a ground-mounted PV system with large central inverters sends an email alert that system performance is at 50% based on irradiance and temperature performance calculations. No inverters are completely offline. The closed technician is a 4-hour drive from the site, and there are no cameras on site. Which is the BEST response to this situation?

 
 
 
 

Q46. An installer was asked to provide a means to measure the voltage of each battery in a system. The bank is located 50 ft.
From the data logger. The installer will be using shielded. Twisted pairs of instrumentation wiring, all run in the bundle a conduct.
The signals are connected to isolated and ungrounded inputs at a data logger. Which safely precaution is MOST needed to protect the instrumentation wiring?

 
 
 
 

Q47. Which load path connections need to be analyzed when determining live and dead loads on a PV array system installed directly to a metal seam roof?

 
 
 
 

Q48. Inspection of a new PV installation shows that the dwelling uses a galvanized water pipe for its grounding electrode and that the PV system now shares the connection. Which of the following is an acceptable supplemental electrode method to ensure the integrity of having a grounding electrode?

 
 
 
 

Q49. A grid-interactive PV system with battery backup is being installed with a ground-mounted PV array located
200 ft, from the inverter and batteries. The dc PV output circuit has overcuit has overcurrent protection rated from 30A. To reduce voltage drop between the array and batteries, the output circuit wire size was determined to be 6 AWG. The fused dc disconnect between the inverted and batteries is rated for 300A. What is the required size of the equipment grounding conductor between the metal battery case and the inverter?

 
 
 
 

Q50. Which insulation color is allowed for a current-carrying roottop dc conductor on a functionally grounded 6kw PV system?

 
 
 
 

Q51. A PV technician is installing a 6.5KWac inverter using a 40A backfed breaker. The single line shows a 200A panelboard with a 200A breaker, but the installer finds that the panelbord actually has a 150A main breaker.
Which of the following is the CORRECT installation option?

 
 
 
 

Q52. A PV system installation utilizes micro inverters connected to each module of the array. Each micro inverter has a nominal rated output of 250WV. Single phase. The microinverters are listed so that multiple inverters may be connected in parallel to a single feeder circuit, and each inverter has ancable and connector rated for
30A. What is the MAXIMUM number of inverters that may be wired together on a single 30A feeder circuit?

 
 
 
 

Q53. A PV system equipped with rapid shutdown requires a label stating ”RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM”.
Which is the BEST description of where this label is required?

 
 
 
 

Q54. A connector not listed to be used in a concealed location and being used as a disconnect for PV equipment shall comply with which of the following?

 
 
 
 

Q55. An installer is hired to troubleshoot a 10-year-old roottop system with open-circuitvoltage of 300V. The ground-fault detection (GFD) device has tripped. The insulation on the exposed source circuit cables has deterlorated with multiple cracks and has no flexibility. Which concern is the MOST likely safely issue when servicing this array?

 
 
 
 

Q56. An 8KWsc roof-mounted array is placed on a school building. The inverter is located within 1 ft, of the array boundary and has an integrated ac-and dc-disconnecting switch. The system is to be connected to a 400A load center, protected by a 400A main breaker. Which of the following MUST be included to meet NEC requirements?

 
 
 
 

Q57. When running horizontal 1-1/4 in, electrical metallic tubing (EMT) with compression fittings, what is the MAXIMUM permissible distance between condult supports?

 
 
 
 

Q58. According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?

 
 
 
 

Q59. On a PV system larger than 100kw, which PV array design will provide the HIGHEST degree of performance monitoring.
Granularity, and ease of troubleshooting performance issues?

 
 
 
 

Q60. A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery energy backup for protected loads. The MOST important protected load consideration when operating in the backup mode is that:

 
 
 
 

Q61. Which of the following is an NEC requirement regarding access for large-scale PV electric power production facilities?

 
 
 
 

Q62. A commercial 600v carport-mounted PV system is installed with rigid running under the parking lot to an inverter pad located at the edge of the parking lot. At what depth below the parkinglot base MUST condult be buried?

 
 
 
 

Guaranteed Success with PVIP Dumps: https://www.real4dumps.com/PVIP_examcollection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below