[Aug 10, 2023] Get New 2V0-21.23 Practice Test Questions Answers [Q33-Q47]

Rate this post

[Aug 10, 2023] Get New 2V0-21.23 Practice Test Questions Answers

2V0-21.23 Dumps and Exam Test Engine

Q33. An administrator needs to configure a content library solution based on the following information:
* A new corporate virtual machine (VM) template is created every month to include all of the latest patches.
* The new VM template should be downloaded from the primary data center site (London) to two secondary data center sites (Tokyo and New York) as soon as possible.
* There is limited disk space available at one of the secondary data center sites (Tokyo) due to an ongoing data center consolidation project.
Which four steps should the administrator take to configure the content library solution before adding a VM template? (Choose four.)

 
 
 
 
 
 
 

Q34. A vSphere cluster hosts a three-tier application The cluster has 50% resources available. If a host in the cluster fails, the database server must be online before the application server, and the application server must be online before the Web server.
Which feature can be used to meet these requirements?

 
 
 
 

Q35. An administrator must gracefully restart a virtual machine (VM) through the vSphere Client but the option is greyed out. The administrator has full administrative access on VMware vCenter and all the objects available in vCenter, but has no access to log onto the operating system.
Which action should the administrator take to meet the objective?

 
 
 
 

Q36. An administrator is responsible for performing maintenance tasks on a vSphere cluster. The cluster has the following configuration:
. Identically configured vSphere ESXi hosts (esx01, esx02, esx03 and esx04)
* All workloads are deployed into a single VMFS datastore provided by the external storage array
* vSphere High Availability (HA) has not been enabled
* vSphere Distributed Resource Scheduler (DRS) has not been enabled
Currently, a critical production application workload (VM1) is running on esx01.
Given this scenario, which two actions are required to ensure VM1 continues to run when esx01 is placed into maintenance mode? (Choose two.)

 
 
 
 
 

Q37. An administrator is planning to upgrade a VMware vCenter instance to version 8. It is currently integrated with the following solutions:
* VMware Aria Automation
* VMware Cloud Director
Which tool can the administrator use to run Interoperability reports before the upgrade process?

 
 
 
 

Q38. An administrator plans to update the Supervisor cluster and has noticed some of the Tanzu Kubemetes Grid clusters are running an incompatible version.
Which action must the administrator take before proceeding with the Supervisor cluster update?

 
 
 
 

Q39. An administrator is responsible for the management of a VMware vCenter instance that is currently experience performance issues. The administrator quickly identifies that the CPU and memory utilization of vCenter is consistently over 90%. Upon further analysis, it seems that the vpxd process is contributing significantly to the performance issue.
A combination of which four steps should the administrator take to resolve the performance issues and ensure that a similar issue can be rectified without required downtime to vCenter moving forward? (Choose four.)

 
 
 
 
 
 

Q40. administrator successfully installs VMware ESXi onto the first host of a new vSphere duster but makes no additional configuration changes. When attempting to log into the vSphere Host Client using the Fully Qualified Domain Name (FQDN) of the host, the administrator receives the following error message:
”server Not Found -we can’t connect to the server at esxit101.corp.local.”
* Host FQDN: esxi 101. Corp. local
* Management VLAN ID: 10
* DHCP: No
* Management IP Address: 172.16.10.101/24
* Management IP Gateway: 172.16.10.1
* Corporate DNS Servers: 172.16.10.5, 172.16.10.6
* DNS Domain: corp.local
Which three high level tasks should the administrator complete, at a minimum, in order to successfully log into the the vSphsrs Host Client using the FQDN for the exxi101 and complete the configuration (Choose three.)

 
 
 
 
 
 

Q41. An administrator is preparing for a deployment of a new vCenter Server Appliance. The following information has been provided to complete the deployment:
* ESXi Host name (FQDN): esxOl.corp local . ESXi IP Address: 172.20.10.200
* vCenter Server Name (FQDN): vcsa01 corp.local
* vCenter Server IP Address: 172.20 10.100
* NTP Server: 172.20.10.20
* DNS Server: 172.20.10.1
* Deployment Size: Tiny
* Storage Size: Default
Which two actions must the administrator complete before starting the installation of the vCenter Server Appliance? (Choose two.)

 
 
 
 
 

Q42. An administrator is configuring vSphere Lifecycle Manager to install patches to a vSphere cluster. The cluster runs workload virtual machines (VMs) that are incompatible with vSphere vMotion, and therefore cannot be live migrated between hosts during the installation of the patches.
Which configuration in vSphere Lifecycle Manager will allow the administrator to reduce the downtime associated with the patching operation without migrating the VMs?

 
 
 
 

Q43. To keep virtual machines (VMs) up and running at all times in a vSphere cluster, an administrator would like VMs to be migrated automatically when the host hardware health status becomes degraded.
Which cluster feature can be used to meet this requirement?

 
 
 
 

Q44. To keep virtual machines (VMs) up and running at all times in a vSphere cluster, an administrator would like VMs to be migrated automatically when the host hardware health status becomes degraded.
Which cluster feature can be used to meet this requirement?

 
 
 
 

Q45. An administrator plans to bring VMware vCenter offline in order to perform hardware mainte-nance on the host where the vCenter Server Appliance is running.
Which vSphere feature must be configured to ensure that vCenter users experience minimal downtime?

 
 
 
 

Q46. An administrator is tasked with installing VMware vCenter. The vCenter Server Appliance must support an environment of:
* 400 hosts
* 4000 virtual machines
Which two resources must be allocated, at a minimum, to meet the requirements? (Choose two.)

 
 
 
 
 

Q47. Refer to the exhibit.

After updating a predefined alarm on VMware vCenter, an administrator enables email notifications as shown in the attached alarm; however, notifications are NOT being sent.
Where must the mail server settings be configured by the administrator to resolve this issue?

 
 
 
 

VMware 2V0-21.23 certification exam is a 135-minute test that consists of 70 questions. The test is available in English and can be taken online or in-person at a Pearson VUE testing center. 2V0-21.23 exam fee is $250, and candidates must score at least 300 out of 500 to pass the test.

VMware 2V0-21.23 certification exam is designed for professionals who are interested in validating their skills and knowledge related to the VMware vSphere 8.x Professional. VMware vSphere 8.x Professional certification test is ideal for candidates who want to demonstrate their expertise in designing, implementing, and managing VMware vSphere solutions.

 

2023 New Real4dumps 2V0-21.23 PDF Recently Updated Questions: https://www.real4dumps.com/2V0-21.23_examcollection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below