C-TS412-1909 Exam Preparation Material with New C-TS412-1909 Dumps Questions [Q57-Q81]

Rate this post

C-TS412-1909 Exam Preparation Material with New C-TS412-1909 Dumps Questions

C-TS412-1909 2022 Training With 112 QA’s

SAP S/4HANA Project Systems Certification Exam Topics:

Topic Areas Topic Details, Courses, Books Weighting
Resources Describe how the Resource Planning process integrates with HCM

S4122 (SAP S/4HANA 1909)

> 12%
Material Explain Work breakdown structure BOM, BOM PS Interface, component assignment in the network, material procurement

S4122 (SAP S/4HANA 1909)

> 12%
Project Structures Name the components of Work Breakdown Structure, Network and activities, Milestones

S4121 (SAP S/4HANA 1909)
S4122 (SAP S/4HANA 1909)

> 12%
Reporting Determine general reporting requirements and reporting requirements for cost centers. Configure cost center reporting and create report painter reports

S4120 (SAP S/4HANA 1909)

< 8%
Cost and Budgets Describe procedures for establishing budgets and reporting costs.

S4123 (SAP S/4HANA 1909)

> 12%
Dates Describe the importance of various dates which can be tracked for projects

S4122 (SAP S/4HANA 1909)

> 12%

 

NO.57 Project Structures
Which the following statement regarding networks are correct?.
Note : there are 3 correct answers for this question.

 
 
 
 
 

NO.58 You use networks and internal activities in your project. You have activated capacity requirements and notice that one work center is overloaded. You have no authorization to change the work center. How can you reduce the overload of the work center? Note: There are 2 correct answers to this question

 
 
 
 

NO.59 Project Structures
You are using assembly processing. You need to determine the delivery date of a sales order item with an account assignment to the project.
What are the prerequisites?
Note: There are 3 correct answers to this question

 
 
 
 
 

NO.60 The basic dates of subordinate WBS elements should be extrapolated without taking into account the basic dates of higher-level WBS elements. What planning method for basic dates do you use?

 
 
 
 

NO.61 The__________________that you specify when you create a project definition is unique for the entire project. Choose the correct answer.

 
 
 
 

NO.62 How can you grant individual authorization for WBS elements and networks?

 
 
 
 

NO.63 Which sets of dates can be used to schedule networks? Note: There are 2 correct Answers to this question.

 
 
 
 

NO.64 Which planning method can prevent further rescheduling of activities?

 
 
 
 

NO.65 Dates
How are earliest dates and latest dates of activities schedule?

 
 
 
 

NO.66 Material
Your customer uses Progress Tracking for network components and mantains dates of events manually. They need to implement scheduling of events.
What is the requisites for implement scheduling of events?

 
 
 
 

NO.67 Which of the following is used to plan basic dates manually for WBS elements? Choose the correct answers. There are 2 correct answers to this question.

 
 
 
 

NO.68 Which of the following actions can transfer actual costs for external processing? Note: There are 2 correct answers to this question

 
 
 
 

NO.69 Dates
You have a project with a network, material and milestone. You want to plan an activity to start two days after its predecessor. How can you do that?
Note : there are 2 correct answers for this question.

 
 
 
 

NO.70 You have activated the workflow for confirmation variances in SAP Project System. Who is the receiver of this workflow item?

 
 
 
 

NO.71 What are the prerequisites for delivering materials from the project? Note: There are 2 correct Answers to this question.

 
 
 
 

NO.72 You are using WBS elements and activities are NOT assigned. Which statements apply to the maintenance of the actual start and finish? Note: There are 2 correct Answers to this question.

 
 
 
 

NO.73 Which report can use user-specific layouts?

 
 
 
 

NO.74 An external component is assigned to a network activity. The delivery date for the purchase requisition depends on the dates of the network activity.
What controls whether the delivery date is defined by the earliest or latest scheduled dates?

 
 
 
 

NO.75 Project Structure
Which statement regarding the creation of a new work breakdown structure (WBS element) are true?
Note : there are 3 correct answer for this question.

 
 
 
 
 

NO.76 Your customer has created networks with internal activities and generated capacity requirements. Now,
they want to analyze the capacity requirements of their project. Which report do you recommend?

 
 
 
 

NO.77 For which objects can billing plans be created? Note: There are 2 correct answers to this question

 
 
 
 

NO.78 You want to create a reservation for a material component assigned to a network activity.
However, after releasing and saving the activity, no reservation is created. What are some possible reasons for the missing reservation?
Note: There are 2 correct answers to this question

 
 
 
 

NO.79 Which object is used to allocate the costs from a claim to the project structure?

 
 
 
 

NO.80 You want to allocate overhead rates to a WBS element. What must you assign to the WBS element?

 
 
 
 

NO.81 You want to establish costing for WBS. Costing should be easy to use and should not refer to cost elements. What method for costing do you use?

 
 
 
 

C-TS412-1909 Exam Certification Details:

Duration: 180 mins
Exam: 80 questions
Languages: English

 

Quickly and Easily Pass SAP Exam with C-TS412-1909 real Dumps: https://www.real4dumps.com/C-TS412-1909_examcollection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below